Thanks for the link and further explanation. Nice
to consider options.
Not crazy about the requirement to drill hole in board though. I have a Fliteboard proven watertight setup now. Potential leak from drilled hole isn’t a risk I’m willing to take😉
From @ludwig_bre post it doesn’t sound like a good idea for other reasons.
So in my instance I could use the port 7 Hall VESC connection right beside port 6 COMM for 5V and GRD and pull the existing wire for ACD2 out of the remote connection cable and make up a harness that I can then string to wherever I place the Hall switch? That sounds pretty straightforward if I’m interpreting your guidance correctly😀
Do all the Hall sensors work at both 3.3V and 5V or is that model specific?