Engineers and builders, How much are you willing to sell your complete efoil ?
Requirement:
- 50min run time for 180lbs guy
- Must be Safety…
- 100 hours life span min.
- Must have the ability to produce more than ten units/year.
Engineers and builders, How much are you willing to sell your complete efoil ?
Requirement:
Presently, that is a demanding request. Either the board has difficulties to move a 150lbs rider or the autonomy is less than 50 min. Then if you live in a country where open propellers might not be allowed, using a jet drive means at least 20% loss on battery time with respect to a propeller based system offering a better efficiency.